What belongs in an HOA solar approval packet
Gather the HOA/ARC form, a roof or site plan, photos, panel and inverter specs, contractor papers if required, and any solar guidelines into one packet before the meeting.
Most solar requests stall for a paperwork reason, not a panel reason. The committee meets on a calendar. If a required exhibit is missing, the file often goes back to the owner and the review window starts over. That is why incomplete packets reset the 30-day clock.
This page is a packing list for a rooftop-solar architectural request. It is not legal advice, not a reading of your CC&Rs, and not a prediction that your HOA will approve anything. You still use your community’s own form and you still submit the packet yourself.
Start with the form your HOA actually uses
Every community has its own architectural review form, sometimes called ARC, ACC, or a modification request. Download or scan that form. Fill it as far as you can before you assemble the rest of the packet. A clean packet does not replace the official form; it sits behind it so the reviewer does not have to hunt through email attachments.
Do not use a generic form you found online as if it were official. If your association issues a PDF or a paper sheet, that is the exhibit that belongs first.
Show the array on a roof plan, site plan, or survey
Reviewers need to see where the panels will sit relative to the roof ridges, eaves, vents, chimneys, lot lines, and any street or common-area view. An installer layout, a roof plan, a plat, or a simple site plan with the proposed array marked is usually enough to start the conversation. Mark the roof planes you intend to use and note tilt or orientation if the drawing already has it. If you only have a phone photo of a paper survey or a marked-up installer sketch, that can still go in the packet. Label it so it is obvious what the reviewer is looking at.
Photograph what is there today
Current-condition photos answer a different question than the drawing: what does the roof and street front look like now? Take at least one clear photo of each roof plane you plan to use. Several views are better — the array roof, a street-facing elevation, and any neighboring view that will see the panels. Use daylight. These photos also help later if a neighbor or inspector asks what changed. Keep the originals with your submission copy.
Attach panel and inverter specs, not just a brand name
Write the project type (rooftop solar), panel count or system size, and a planned start date on a short cover, then attach the cut sheets for the modules and the inverter or microinverters. A named product with dimensions and finish is easier to compare against the neighborhood standard than a vague “black panels.” Color, frame finish, and whether the array is flush-mounted still belong on the cover even when the spec sheet repeats them, because reviewers often read the cover first.
Insurance and license if your community asks
Some associations ask for a contractor license or a certificate of insurance before work starts. If you have them, include them as later exhibits. If you do not, say so in the packet rather than leaving a silent gap. Your HOA may still ask for them later. Saying “not provided” keeps the file honest.
Include the HOA solar guidelines if they exist
Many communities publish a solar addendum, a design guideline, or a short page in the architectural rules about roof arrays, screening, or street-facing planes. If yours has one, print or save that page and put it in the packet. It shows you read the local rule instead of guessing. If there is no separate solar guideline, do not invent one. A note that none was issued is clearer than a missing exhibit.
A copy for yourself
Keep a timestamped copy of whatever you submit. If the file is later described as incomplete, you can show what was in the packet on the day you turned it in. Some communities also ask neighbors to sign that they have seen the plan. That is a community rule, not a universal law. Collect those signatures only if your HOA uses them.
A working order for the exhibits
- Cover with name, address, project type (rooftop solar), panel count or system size, start date
- Completeness checklist so missing items are visible
- Exhibit A — HOA / ARC form
- Exhibit B — roof plan, site plan, or survey
- Exhibit C — current-condition photos
- Exhibit D — panel and inverter product specs
- Exhibit E — contractor license or insurance, or a page that says it was not provided
- HOA solar guidelines, if the community issued any
- Your dated submission copy
Frequently asked questions
What do I need in an HOA solar approval packet?
Start with the architectural form your own HOA issues (ARC, ACC, or modification request). Add a roof or site plan with the array marked, current-condition photos of the roof and street view, panel and inverter product specs, contractor license or insurance if your community asks for them, and a copy of any HOA solar guidelines. Put a short cover on top with name, address, project type (rooftop solar), panel count or system size, and a planned start date, plus a completeness checklist so missing items are visible.
Can I submit without a roof plan or survey?
A roof plan, site plan, or survey is what reviewers use to see ridge lines, setbacks, vents, and whether the array faces a street or common area. If you only have the installer’s layout sketch or a phone photo of a paper survey, include it and label it. Do not leave that slot empty. Your HOA may still ask for a clearer drawing later.
What photos should I include for a solar request?
Current-condition photos of the roof planes you plan to use, in daylight, plus at least one street-facing view of the house. Several angles are better: the array roof, any neighboring roof that will see the panels, and the front elevation. These are not product shots; they show what is there today.
What if I do not have contractor insurance or a license copy?
Include them if you have them. If you do not, say “not provided” in the packet rather than leaving a silent gap. Some associations will still ask for a license or certificate before work starts. That is their rule, not something a packet can waive.
Does this packet get the solar install approved?
No. This page is a packing list. It is not legal advice, not a reading of your CC&Rs, and not a prediction that the board will pass the request. The live paid tool on this site builds fence architectural request packets, not solar PDFs. You still submit to your own HOA.
Also: fence architectural request packets. The paid browser tool at /app/ stacks fence files into one PDF. It does not build a solar packet. Questions: [email protected].
Not legal advice. Guidelines differ by community. Read your own architectural rules before you schedule work.